Important Things During Construction Of Sintered Stone Slabs?

As a new type of material, sintered stone slabs also have some special precautions during construction.

1. Grassroots Requirements

Sintered stone slab construction has certain requirements for the base surface.

First, the base layer must be clean;

Secondly, the base layer must be solid. The increase in the size of the sintered stone slab means that its weight has doubled. If the base layer is not strong enough, the sintered stone slab can easily pull away from the base layer;

Finally, the base layer must be flat and the sintered stone slab must be flat. The slab has high requirements for the flatness of the base layer. If the flatness of the base layer is poor, hollowing may easily occur in parts of the rock slab.

2. Construction Workers And Professional Tools

If the construction workers only have ash knives and hand cutters, processing without professional tools will seriously affect the effect. The construction workers must be familiar with the steps and techniques of using the tools.

3. Transportation On Construction Site

The sintered stone slabs need to be transported with the help of a professional slab lifter. When transporting, be sure to check whether all suction cups are firmly attached to the slabs to avoid safety hazards caused by the suction cups detaching. When kneading, it is necessary to use suction cups to assist in kneading and moving up, down, left, and right.

In addition, an electric vibrator must be used to vibrate to discharge the air between the sintered stone slab and the base layer.

Movement Of Sintered Stone
Movement Of Sintered Stone

4. Bonding Material Requirements

Due to the large area of sintered stone construction, double-sided scraping is required. Due to insufficient opening time of traditional cement and adhesives, the glue has partially initially set when construction begins after scraping the working area, affecting the bonding effect. The selection of a special adhesive for sintered stone slabs is the basis for paving quality. There are strict requirements for initial setting time, expansion rate, bonding force, ease of work, etc.

5. Complex construction technology

Compared with traditional decorative materials, sintered stone slabs have larger specifications and require higher cutting and processing quality. The processing and application of sintered stone slabs require more professional processing techniques.

When constructing sintered stone slabs, it is necessary to ensure the weight of the slab after scraping and the thickness of the bonding material. Therefore, the scraping angle of the toothed knife must be well controlled during the construction process to ensure that the thickness of the bonding material is within 3-6mm. The tooth shapes that come out should be as parallel to each other as possible. In addition, the movement adjustment time within 5 to 10 minutes after the sintered stone slab is laid should be grasped during the trial laying, and cleanliness should be ensured during construction. Professional tools such as flattening auxiliary materials and limiters should be used during construction.

The above is relevant information about the sintered stone slab construction precautions.

Construction Of Sintered Stone Slabs
Construction Of Sintered Stone Slabs

Related: Sintered Stone Strong Point And Weak Point

IN THE END

As A New Stone Products, SINTERED STONE Has Become A Strong Competitor To Marble, Granite And Quartz Stone. Sintered Stone Is A Stone You Can Not Ignore. If You Also Want to Develop A Brand Of Your Own, Come To Us, We Are The Right Choice.

CONTACT US AT

Email: hero@linxsintered.com
WhatsApp: +86 180 0549 3293

USEFUL LINKS

YOUTUBE CHANNEL: LINX SURFACES CHINA

WIKI: Sintered Stone Linx “Wikipedia”

CHINA SINTERED STONE MANUFACTURE, WHOLESALE AND EXPORT - LINX
Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *